Till, Test and Treat – Preparing Your Yard for Sod

Are you ready to turn that patch of dirt into a lush lawn? Preparing your yard for the installation of sod amounts to tilling the area, testing the soil, and then treating the soil according to the test results. Smoothing, rolling and watering complete the process.

For the best result, rototill or spade the area to a depth of 10 to 15 cm. (4 to 6 inches). Eliminate drainage problems by having soil slope away from foundations, etc.

Soil test your lawn area with the assistance of qualified service in your area. Then rake in fertilizer, lime, peat, compost, etc. as needed to a depth of 7 to 10 cm. (3 to 4 inches). Rake and smooth the soil removing rocks, roots, and large clods. Roll the area lightly with a lawn roller 1/3 full of water. This will firm the soil surface and reveal low areas that need more soil. Keep the grade 2 to 3 cm. (1 inch) below sidewalks or driveway.

Water the prepared area to settle soil and provide a moist base for turf. Moistening to a depth of 15 cm. (6 inches) is recommended for most soils.

  • Share/Save/Bookmark

Tags: , , , ,

Leave a Reply

You must be logged in to post a comment.


home about us turf grasses resources careers contact us news client spotlight store locator sitemap
© Bethel Farms, All Rights Reserved

internet strategy by Phoenix Web Design & Phoenix Internet Marketing gatesix

naprosyn 250 mg viagra 25 mg